Health Contracts

Horatio’s Garden – Northern General Hospital, Sheffield

We’re proud to have recently delivered the electrical and mechanical works for the beautiful new Horatio’s Garden at Northern General Hospital’s HRH Princess Royal Spinal Centre in Sheffield.

Part of a national charity initiative, Horatio’s Garden provides a calming, accessible outdoor space designed to support the wellbeing of patients with spinal injuries, as well as their families and the dedicated NHS staff who care for them. The project was officially opened by HRH The Princess Royal, patron of the Horatio’s Garden charity.

Working closely with the project team, W Wright Electrical & Mechanical carried out the full scope of electrical and mechanical installations. This included power distribution, lighting (both functional and atmospheric), heating, ventilation, and water systems – all designed to integrate seamlessly into the garden’s peaceful setting and high-spec design.

Completing works in a healthcare environment always requires a sensitive, well-coordinated approach, and we’re proud to have contributed to a project that will provide lasting benefits to the spinal centre’s patients and community.

NGH Chesterman Theatres

Project Overview

W Wright Electrical & Mechanical successfully completed the mechanical installation for the extensive refurbishment of the Cardiothoracic Theatres in the Chesterman Wing at Northern General Hospital in Sheffield. This complex, multi-phase project upgraded five operating theatres and their associated recovery areas within a fully operational hospital environment.

The Challenge

The primary challenge was modernizing critical healthcare infrastructure while maintaining uninterrupted service in an active wing of the hospital. This required a carefully managed, phased approach to minimize disruption to staff and patients. Coordination with the main contractor, and other trades was essential to ensure all milestones were met on schedule.

Our Solution: Mechanical Installation

As the mechanical installation specialists, our team delivered a state-of-the-art system designed for a modern hospital environment. Our scope included:

Blue icon A Building Management System (BMS) controlled heating and ventilation system integrated with the existing hospital network.

Blue icon Installation of new medical gas systems, critical for surgical procedures.

Blue icon New domestic hot and cold water services, along with updated sanitaryware.

Blue icon Ventilations systems ductwork to ensure optimal air quality

Blue icon Heating installation

Blue icon Chilled water systems

Outcome

The project, completed in spring 2025, has transformed the cardiothoracic facilities into a state-of-the-art environment for both patients and staff. W Wright's precise planning and execution ensured the delivery of a fully compliant, high-quality installation that met the stringent demands of a modern healthcare facility without compromising the critical daily operations of the hospital.

Read More

Read Less

NGH Photon CT Scanner

W Wright Electrical & Mechanical recently completed the mechanical services works for the installation of a state-of-the-art Photon Counting CT Scanner at the Radiology Department Scanner Suite at Northern General Hospital, part of Sheffield Teaching Hospitals NHS Foundation Trust.

Appointed on a Design & Build basis, we worked in close collaboration with Siemens and the Trust to deliver high-spec, fully compliant mechanical installations that meet both the technical requirements of the new scanner and the standards set out in current HTMs.

Scope of Works:

Design and installation of a dedicated chilled water system, including supply and commissioning of run-and-standby roof-mounted chillers to support the scanner’s cooling demands.

Integration of pressurisation units, expansion vessels, and BMS-compatible controls.

Adaptation and upgrade of existing HVAC systems, including ductwork modifications, new extract systems, and replacement of fire and smoke dampers.

Medical plumbing works, including new clinical washbasins, medical gas connections, and the reconfiguration of water services.

Full commissioning, including system chlorination, flushing, and refrigerant handling.

All works were delivered within a live hospital environment, with careful planning to minimise disruption to clinical services. The successful completion of this project supports the introduction of the latest imaging technology, improving diagnostic capabilities and patient outcomes across the region.

Read More

Read Less

RDGH Breathing Space CT Scanner

W Wright Delivers Critical Infrastructure for New Rotherham CDC

W Wright Electrical & Mechanical is proud to have served as the Principal Contractor for the relocation of a crucial CT scanner to the new Community Diagnostic Centre (CDC) at Breathing Space in Rotherham. In a project completed in June 2024, our team handled all aspects of the complex move, including:

Blue icon Specialised M&E systems: We designed and installed new electrical and mechanical supplies to meet the precise and demanding requirements of modern medical imaging equipment.

Blue icon Accessibility improvements: An accessible walkway and other general building works were constructed to ensure the facility meets the highest standards for patient access and safety.

Blue icon Project management: Through close collaboration with all stakeholders, the relocation was completed on time and with minimal disruption to ongoing hospital services.

This project highlights W Wright's expertise in delivering sophisticated, high-stakes M&E and building services for the healthcare sector, further cementing our long-standing relationship with the Rotherham NHS Foundation Trust.

RDGH MTC

A Decade of Dedicated Service: W Wright Electrical & Mechanical and Rotherham NHS Foundation Trust

Our enduring partnership as Principal Contractor ensures excellence and reliability for Rotherham Hospital.

Since 2009, W Wright Electrical & Mechanical has proudly served as the Principal Contractor for the Measured Term Contract (MTC) at Rotherham NHS Foundation Trust. With a permanent, on-site presence at Rotherham Hospital, our dedicated team has become an indispensable part of the hospital's operations, providing reliable, high-quality service for all electrical, mechanical, and builders' work.

This long-standing partnership is a testament to the trust and collaboration we have built with the Trust and its various teams over the years. Our team’s deep familiarity with the campus and its unique needs allows us to respond quickly and efficiently, whether for routine maintenance or complex refurbishment projects.

Key projects and our impact

Through our MTC, we have played a vital role in transforming and modernising Rotherham Hospital. Our work includes:

Supporting the new Urgent and Emergency Care Centre: We undertook critical preparatory work to enable the construction of the new UECC, including managing complex ward moves and system changes in a live hospital environment.

Ward refurbishments: Our team has completed extensive redesign and upgrade work on numerous wards, including A2, A3, A4, A7, and B11, as well as the ongoing update of the Children's Ward.

Enhancing specialist departments: We have delivered comprehensive refurbishment projects for key departments, including Pathology and the Pharmacy Dispensary Unit.

Supporting hospital development: Beyond major refurbishments, our team enabled the demolition of the former mental health site and helped develop specialist family suites.

A partnership built on trust and a 'can-do' attitude

Our on-site manager, Matt, was even nominated for an award by Ann Kerrane, the Assistant Director for Infection Prevention and Control at the Trust. Ann praised the team’s "professional can-do attitude," and said she was confident that all work would be performed to the highest standards, meeting stringent infection prevention and control, cleanliness, and safety requirements.

This recognition highlights our commitment to seamless delivery and underscores our core values of professionalism, reliability, and close collaboration with hospital staff.

Our commitment to the future

As we continue to manage the Measured Term Contract at Rotherham Hospital, W Wright Electrical & Mechanical remains dedicated to delivering excellence in every task, from minor repairs to large-scale project management. We are proud to support the Trust's mission of providing outstanding healthcare to the people of Rotherham and look forward to continuing our successful partnership for many years to come.

Read More

Read Less

RDGH SCBU

We are proud to have delivered the full refurbishment of the Special Care Baby Unit (SCBU/Neonatal Unit) at Rotherham Hospital, creating a modern, resilient and comfortable environment for some of the hospital’s most vulnerable patients.

Project Overview

Working to a challenging 16-week programme, our team successfully managed and coordinated the complete refurbishment package. All works were delivered to the highest standards, with careful planning to ensure full compliance with healthcare regulations and minimal disruption within the live hospital environment.

Scope of Works

Electrical Services

Blue icon Complete new lighting scheme for both clinical and comfort needs

Blue icon General and essential power distribution throughout the unit

Blue icon Fire alarm and detection system installation

Blue icon New security systems for patient and staff

safety

Blue icon IPS and UPS systems to guarantee resilience for critical equipment

Blue icon Voice & data installations

Mechanical Services

Blue icon New air handling unit providing improved air quality and infection control

Blue icon Domestic hot and cold water systems

Blue icon Heating and ventilation upgrades

Blue icon Medical piped gases infrastructure for neonatal care

Blue icon Air conditioning for precise environmental control

Builders’ Works & Finishes

Blue icon New partitions and wall construction

Blue icon Hygienic and durable flooring installation

Blue icon Full redecoration to create a welcoming and clinical environment

Blue icon New suspended ceilings

Blue icon Fire compartments

Outcome

Despite the tight 16-week timeframe and complex coordination, the project was delivered on time and to specification. The refurbished unit now provides a state-of-the-art facility, offering the highest standards of safety, comfort and resilience for babies, families and staff.

This project highlights our expertise in delivering complex healthcare refurbishments to strict deadlines, seamlessly integrating electrical, mechanical and building services with high-quality finishes.

Read More

Read Less

RHH Heating Project

W Wright proudly served as the Mechanical and Electrical Services Contractor and principal contractor for a vital project commissioned by Sheffield Teaching Hospitals NHS Foundation Trust. This large-scale project involved replacing existing steam boilers and calorifiers with modern, energy-efficient condensing boilers, enhancing the heating systems across multiple hospitals within the Sheffield region.

The project aimed to significantly improve the efficiency of the Low Temperature Hot Water (LTHW) Heating systems that serve the Royal Hallamshire Hospital, Jessops Wing Maternity Hospital, Weston Park Hospital, and Charles Clifford Dental Hospital.

Key Project Deliverables:

The scope of work involved a range of complex and technically demanding tasks, all of which were carried out while maintaining a high standard of safety and minimizing disruption to hospital services. The key components of the project included:

Dismantling and Removal of Existing Boilers and Flues:

The first step in the process was to carefully decommission and remove the existing steam boilers and flue systems. This was a crucial phase to ensure that the outdated systems were fully dismantled and cleared to make way for the new installations.

Installation of New Support Steelwork and Flooring:

In order to support the new condensing boilers, we installed robust steelwork and upgraded the flooring, ensuring that the new systems would be securely mounted and stable over the long term.

Installation of 9 x 1.5MW Condensing Boilers:

Nine new 1.5MW condensing boilers were installed, offering enhanced energy efficiency compared to the old steam boilers. These new systems provide better heat generation and significantly reduce energy consumption, contributing to both environmental sustainability and cost savings.

New Conventional Flue Installations:

We installed new conventional flue systems from the C&D floors, carefully designed to terminate at the T floor. This ensures that the new boilers operate with the optimal flue design, promoting safe and efficient venting of exhaust gases.

Automatic Pressurisation and Expansion Systems:

The project also involved the installation of new automatic pressurisation units and expansion systems, which help regulate water pressure within the heating systems and prevent system failures due to over-pressurisation.

Side Stream Filtration Systems:

To maintain the cleanliness and efficiency of the heating systems, side stream filtration systems were incorporated, ensuring that water quality is maintained, and the systems continue to operate at peak efficiency.

LTHW Heating and Gas Pipework Installations:

Comprehensive pipework installations for both the LTHW heating system and the gas supply were completed. This was essential for connecting the new condensing boilers to the existing infrastructure while ensuring safety and compliance with regulations.

Thermal Insulation Works:

To minimize energy loss, thermal insulation was applied to the pipes and systems, ensuring the heating system operates efficiently by retaining heat and reducing waste.

Heat Meter Installations:

New heat meters were installed to provide accurate measurement and monitoring of energy usage, helping the hospital trust track consumption and manage energy costs effectively.

Automatic Controls & BMS Installations:

The installation of advanced Building Management System (BMS) controls allows for seamless integration and monitoring of all mechanical and electrical systems. This intelligent control system enhances operational efficiency, providing real-time data for better decision-making and maintenance planning.

Automatic Gas Safety Shut Off Systems:

To ensure the safety of hospital staff and patients, automatic gas safety shut-off systems were installed, which provide immediate isolation of gas supplies in the event of a fault or emergency.

Electrical Installations:

Our electrical team carried out the necessary electrical work to support the new systems, including wiring, connections, and integration with the existing infrastructure.

Read More

Read Less